Tuesday, July 9, 2013

Engine Install Mercruiser 260 Alpha 1

Pulled the boat outside to install the rebuilt 5.7L Mercruiser Alpha 1 always nice to have a clean gelcoated bilge to work in .










 Seatrial !!!


Ski Boat Floor

Now replacing the damaged piece of floor around Ski Locker putty fare and glass entire piece and overlap and make ready for gelcoat.


 





 Layer of 1.5 oz Mat and a layer of Biax should do the trick


 Fit and dry install Ski Locker hatch and remove to gelcoat deck.

 Gelcoated ready for Glue and some indoor/outdoor carpet from The Home Depot

 Time to get the motor in and checked out

Thursday, June 27, 2013

Ski Boat

Replacing floor around ski locker Also found a little bit more rot in subfloor of anchor locker we will just leave that open and Paint it whit maybe later make a Mahogany grate to keep skis out of bilge



Building the leaning post

Building the leaning post storage box for an 18






Saturday, May 4, 2013

Rigging

Installing Tohatsu 50 TLDI on 22ft Lady Bug that Mr. Dulka built with our plans a great job



Saturday, April 20, 2013

Wednesday, March 27, 2013

Friday, March 22, 2013

Plywood deck

Installing a plywood deck on a Chesapeake 22 customer wants self bailing . Bilge sealed with Gluvit